www.
SY-Country
.co.uk
Content Welcome News Trip Reports Steam Lines Locomotive List Travel Tips Links
Steam in China  :   September - October2000

Till Mosler

Dahuichang, Tonghua, Da`an Bei, Jingpeng, Yi Xian, Yebaishou


Dahuichang Limestone Rlwy., Sept 16th
As usual, traffic did not start before 14:00. Two engines (No. 1 and 3) were in use.

Tonghua/Hunjiang, Sept 17th - Sept 24th

Sept 17th
A visit to Tonghua shed between 10:00 and 12:00. The following JS could be noted there (workable if nothing different indicated) : JS 6020, 6021, 8154, 8155, 6360(cold, oou), 5485(cold, oou), 6271(under repair ?), 6557(cold, oou), 5731(dumped), 5751
Later, JS 5731, 8231 und 5855 were seen shunting/ waiting in the station. The rest of the day was spent between Daoqing and Guyuan.

G 13:00 DF5 ? nb
T646 14:05 DF4 ? sb
G 14:50 JS 6306 sb
G 15:30 DF5 5010 sb
G 16:00 DF5 ? nb

Sept 18th
The day was spent at Daoqing/ Guyuan again.

G 09:00 JS 8158(tf) nb
T651 09:35 DF5 1193 nb
G 10:30 DF5 ? sb
T666 10:50 DF4 ? sb
G 11:20 JS 8158 sb
T 645 11:40 DF4 ? nb
T646 14:15 DF4 ? sb
G 14:55 JS 6306 sb
T652 15:25 DF5 5010 sb
G 16:00 JS ? nb
G 16:20 JS 5858 sb

Sept 19th : Daoqing/Guyuan

T808 08:35 JS 5855 sb
G 08:45 JS 6366 nb
T651 09:35 DF5 nb
G 10:25 DF5 nb
T666 10:50 DF4 4125 sb
G 11:20 JS 5858 sb
T645 11:40 DF4 nb
G 12:30 DF5 1193 nb
G 13:15 JS 8158 sb
T646 14:10 DF4 4160 sb
T652 15:30 DF5 sb
G 15:50 JS 6306 nb

Sept 20th - Sept 23rd : See Thorge and Florian`s Report

Sept 24.09
Daoqing-Guyuan

G 08:20 DF5 nb
T808 08:45 DF5 sb
G 09:00 JS 6366 sb

Dongtonghua

G 10:00 JS 8201 sb
G 10:30 JS ? nb
G 11:00 DF5 nb

Near Zazi

G 13:25 DF5 1256 sb
T646 14:10 DF4 4232 sb
G 14:45 DF5 sb
T802 15:20 DF4 4124 sb
G 16:20 JS 6021 sb
G 16:35 JS 8198 nb

Da`an Bei , Sept 26th - Oct 2nd
Business as usual. Some 40 steam locomotives are still in use. The lines to Ranghulu, Taipingchuang and Baicheng were visited. Noted engines :
QJ 3251, 3287, 6112, 6143, 6156, 6361, 6367, 6379, 6435, 6484, 6571, 6586, 6773, 6809, 6825, 6847, 6848(Baicheng), 6851, 6852, 6887, 6888(Baicheng), 6891, 6924, 6926, 7081, 7086, 7113, 7119, 7173
JS 6096(hd), 6237(hd), 6239, 8045(Baicheng)

QJ 6891 has lost its squre-shaped headlights and has the "standard ones" now. During my visit, QJ 6571 and QJ 6809 were sent to Changchun for overhaul. As substitution, a brand-new DF5 took over their duties.
For the 51th anniversary of the "Peoples Republic of China" on Oct 1st, all decorated engines became cleaned thoroughly.
Highest steam levels were on the lines towards Ranghulu and Taipingchuan. The line to Ranghulu is still up to 70% steam worked.
The mixed Y267,Y268 to Baicheng ("tourist train") and T951, T952 to Taipingchuan as well were still hauled steam hauled.

Jingpeng , Oct 3rd - Oct 6th 2000
Business as usual. At the railway crossings along the line, barrier-posts have been installed. They are quite photogenic, too.
Engines : QJ 6027, 6125, 6135, 6274, 6389, 6517, 6577, 6576, 6630, 6828, 6876, 6996, 7009, 7012, 7041, 7137

Yi Xian - Beipiao , Oct 7th - Oct 10th
Four days were spent here (for decription see Thorges and Florian`s Report). Sadly, the "freight timetable" I had got from T.Bockholt/ F.Menius at Tonghua was no longer valid. There was much fewer trains than expected and on 3 out of 4 days, different timings were valid. Most freight traffic was on Saturday 10th !
Due to bad weather on 2 days and infrequent trains, I needed quite much time here. The following tables show freights only.

Oct 7th : Zhoujiatun

G 08:30 QJ 6095 eb
G 09:10 DF4 wb
G 11:00 QJ 6991 wb
G 12:35 QJ 6750 eb
light engine 13:20 QJ 6226 eb
G 14:30 DF4 2118 wb
G 15:00 QJ wb
G 15:50 DF4 2124+QJ 6991 eb
G 16:15 QJ 6752 eb
G 16:40 QJ 6655 wb

Oct 8th : Zhoujiatun

G 09:00 DF4 eb
G 10:50 QJ 6095 wb
G 12:00 QJ 6750 eb
G 13:10 QJ 6410 eb
G 14:55 DF4 wb

Linesiding finished by 15:00 due to bad weather.

Oct 9th : Zhoujiatun

G 09:00 QJ 6991 eb
G 10:45 DF4 wb
G 11:55 QJ 6776 eb
G 13:00 QJ eb
G 14:40 DF4 wb
G 15:00 DF4 wb
G 16:30 QJ 6672 eb

Oct 10th : Zhoujiatun

G 09:15 DF4 2118 eb
G 10:20 QJ 6095 wb
G 11:10 QJ 6480 eb
G 11:45 DF4 wb
G 12:20 QJ 6991 eb
G 15:00 DF4 wb

Light disappeared at 15:00.

Yebaishou , Oct 11th - Oct 12th
During my visit, some 2-3 steam hauled freights each direction were seen on the line to Chifeng during daylight. Volume of freight traffic seems to be reduced significantly. Most of the trains stopped at Shinao and shunted there. So, overtaking them by taxi was no problem.
According to a worker at Yebaishou shed, there are only 12 QJs left at Yebaishou. The line towards Chaoyang is worked by both Yebaishou and Fuxin based engines, which still reach Yebaishou.
The following table show all train movements (!) on the Yebaishou-Chifeng line :

Oct 11th : Shinao

T854 10:30 DF4 sb
G 11:20 QJ 6409 sb
G 13:00 QJ 6728 nb
T853 14:00 DF4 nb
G 14:30 DF4 sb
G 15:35 QJ 6409 nb

Oct 12th : Shinao

G 09:10 DF4 nb
T854 10:30 DF4 sb
G 11:30 QJ 6409 sb
G 13:20 DF4 nb
T853 14:05 DF4 sb
G 15:45 QJ 6409+QJ6413 nb

Engines :

QJ 6086, 6172(Fuxin), 6409, 6410(Fuxin), 6411, 6413, 6416, 6728, 6752(Fuxin)
JS 8236, 8238

Till Mosler


Content Page Trip Report Page

© 2000, T.Mosler